Well done, I am also consider to buy this kit to have a steam plant installed. Would you advise the dimension (L x W)of the two big hole on the deck. I am afraid the the 180mm beam is unable to fit my existing boiler inside.
Sure, I will not modify the deck, to do this not only create other problems thereafter. This will alter the details and appearance of Ulises. If this is the case, I will make another boiler that will fit the deck. I recently find a Japanese model lover, Mr. Taketomi, who had fit a set of Saito steam system to run his Ulises (https://www.youtube.com/watch?v=gn0CX4KDzAQ). I am sure there will be no problem to run this model with my steam engine, but my boiler might be larger than the Saito's. That's why I want to check the hole dimension of the deck from you.
R/C equipment fitted and all working. Put the Tug in the bath and it is clear that I need to add some ballast. Just got the two launches to finish and it is all done,
Well done, I am also consider to buy this kit to have a steam plant installed. Would you advise the dimension (L x W)of the two big hole on the deck. I am afraid the the 180mm beam is unable to fit my existing boiler inside.
ReplyDeleteOn second thoughts, best not to increase size as this will cause problems when fitting the wheelhouse!
DeleteSure, I will not modify the deck, to do this not only create other problems thereafter. This will alter the details and appearance of Ulises. If this is the case, I will make another boiler that will fit the deck. I recently find a Japanese model lover, Mr. Taketomi, who had fit a set of Saito steam system to run his Ulises (https://www.youtube.com/watch?v=gn0CX4KDzAQ). I am sure there will be no problem to run this model with my steam engine, but my boiler might be larger than the Saito's. That's why I want to check the hole dimension of the deck from you.
DeleteNot sure if you got earlier message so dimensions of openings are 215 x 85 and 140 x 85
DeleteGood luck
Thanks to receive this valuable information. In order to install my marine steam plant on to this Ulises, I need to weld another boiler.
ReplyDelete